Planning Permission Guide: How to Get Approval Fast in the UK
If you’re thinking about adding a loft, building an extension, or changing the use of a property, you’ll soon hear the phrase “planning permission”. It can sound scary, but it’s really just a set of rules to make sure new work fits in with the neighbourhood and stays safe. This guide breaks down the basics, shows you when you need permission, and gives simple steps to boost your chances of approval.
When Do You Really Need Planning Permission?
Not every home project needs a formal application. Small changes like putting up a garden shed under 2.5 m high, or adding a single‑storey rear extension within permitted‑development limits, are usually exempt. The key tests are size, height, and impact on neighbours. If you’re unsure, the local council’s website has a handy calculator – plug in your dimensions and it tells you whether you’re in the grey area.
Major projects always need permission. Think of anything that changes the roofline, adds extra floors, or converts a garage into a living space. Even changing the use of a commercial building to residential can trigger a full planning review. When in doubt, call the planning department; a quick phone call can save weeks of wasted work.
Steps to Submit a Successful Application
1. Do your research. Look up the local development plan for your area. It outlines what the council wants – for example, preserving historic facades or protecting green space. Knowing these priorities helps you design a proposal that aligns with local goals.
2. Hire a qualified architect or designer. A professional will produce drawings that meet the council’s technical standards. It’s worth paying for a clean set of plans; vague sketches often get rejected outright.
3. Gather supporting documents. You’ll need site plans, elevations, a design and access statement, and sometimes a heritage impact assessment. Including a neighbour‑consultation letter shows you’ve considered local concerns.
4. Complete the application form. Most councils use an online portal. Fill it out carefully, double‑check the fee amount (fees vary by project size), and upload all documents in the required format.
5. Submit and wait. After submission, the council will post a public notice. Neighbours have 14 days to comment. If there are objections, you’ll get a chance to respond. Staying responsive and polite can turn a protest into a constructive dialogue.
6. Follow up. If you haven’t heard back after the usual 8‑week period, give the planning officer a friendly call. Sometimes a missing signature or a tiny typo can hold things up.
7. Prepare for conditions. Even when approved, the council may attach conditions – like using specific materials or completing work by a certain date. Read them closely and plan your schedule accordingly.
Quick tip: keep a folder with all correspondence, drawings, and receipts. It makes it easier to prove compliance later if the building control officer asks for proof.
Planning permission doesn’t have to be a nightmare. By checking exemption rules early, hiring the right help, and following the steps above, you’ll move from idea to finished build with far fewer hiccups. Ready to start? Grab those measurements, log on to your council’s portal, and take the first step toward turning your vision into reality.